| On object: Starting-up and adjustment works. |
| Budget cost - 5844.25 pуб. |
| the Contract from 03.01.2002г. |
1. Starting-up and adjustment works (rbl.)
| |
the Name of works |
Шифp |
the Unit изм |
Кол-in |
Price ПЗ |
the Price з/пл |
Price ЭМ |
All ПЗ |
All з/пл |
All ЭМ |
| 1 |
Прогрузка the automatic device single-pole |
П1-198 |
шт |
17.00 |
1.00 |
1.00 |
0.00 |
17.00 |
17.00 |
0.00 |
| 2 |
Прогрузка the automatic device triple-pole |
П1-203 |
шт |
3.00 |
3.00 |
3.00 |
0.00 |
9.00 |
9.00 |
0.00 |
| 3 |
Stock-taking of a circuit between заземлителями and the earthed elements |
П1-1229 |
100 точ ек |
0.21 |
11.20 |
11.20 |
0.00 |
2.35 |
2.35 |
0.00 |
| 4 |
Gauging of an apparent resistance of a circuit a phase-zero |
П1-1231 |
a current опр ием н |
12.00 |
0.60 |
0.60 |
0.00 |
7.20 |
7.20 |
0.00 |
| 5 |
Measurement of an insulation resistance by the megger: cable and other lines |
П1-1252 |
лин ия |
26.00 |
0.50 |
0.50 |
0.00 |
13.00 |
13.00 |
0.00 |
| Total |
48.55 |
| With наклад. расх. 1.65 |
80.11 |
| From plans. накопл. 1,06 |
84.92 |
| With constraint 1.1 |
93.41 |
| From actions. электр. 1.3 |
121.43 |
| Recalculation of budget cost К=39.71 of poses. М525-а вып.12/2001-84 |
4821.99 |
| Drawing up of the engineering specifications of 1.5 % |
4821.99 |
| Total on section 1-2 |
0.00 |
| With scheduled accumulation 1.08 |
0.00 |
| Drawing up of the estimate 1.02 |
0.00 |
| Total on section 1-4 |
4821.99 |
| the Tax to users of motorways of 1 % |
48.22 |
| Total with the tax |
4870.21 |
| THE VAT OF 20 % |
974.04 |
| Total from the VAT |
5844.25 |
|
|
|
| On object: Starting-up and adjustment works. |
| Budget cost - 5844.25 pуб. |
| the Contract from 03.01.2002г. |
1. Starting-up and adjustment works (rbl.)
| |
the Name of works |
Шифp |
the Unit изм |
Кол-in |
Price ПЗ |
the Price з/пл |
Price ЭМ |
All ПЗ |
All з/пл |
All ЭМ |
| 1 |
Прогрузка the automatic device single-pole |
П1-198 |
шт |
17.00 |
1.00 |
1.00 |
0.00 |
17.00 |
17.00 |
0.00 |
| 2 |
Прогрузка the automatic device triple-pole |
П1-203 |
шт |
3.00 |
3.00 |
3.00 |
0.00 |
9.00 |
9.00 |
0.00 |
| 3 |
Stock-taking of a circuit between заземлителями and the earthed elements |
П1-1229 |
100 точ ек |
0.21 |
11.20 |
11.20 |
0.00 |
2.35 |
2.35 |
0.00 |
| 4 |
Gauging of an apparent resistance of a circuit a phase-zero |
П1-1231 |
a current опр ием н |
12.00 |
0.60 |
0.60 |
0.00 |
7.20 |
7.20 |
0.00 |
| 5 |
Measurement of an insulation resistance by the megger: cable and other lines |
П1-1252 |
лин ия |
26.00 |
0.50 |
0.50 |
0.00 |
13.00 |
13.00 |
0.00 |
| Total |
48.55 |
| With наклад. расх. 1.65 |
80.11 |
| From plans. накопл. 1,06 |
84.92 |
| With constraint 1.1 |
93.41 |
| From actions. электр. 1.3 |
121.43 |
| Recalculation of budget cost К=39.71 of poses. М525-а вып.12/2001-84 |
4821.99 |
| Drawing up of the engineering specifications of 1.5 % |
4821.99 |
| Total on section 1-2 |
0.00 |
| With scheduled accumulation 1.08 |
0.00 |
| Drawing up of the estimate 1.02 |
0.00 |
| Total on section 1-4 |
4821.99 |
| the Tax to users of motorways of 1 % |
48.22 |
| Total with the tax |
4870.21 |
| THE VAT OF 20 % |
974.04 |
| Total from the VAT |
5844.25 |
|